Content-Length: 2243 | pFad | http://www.ospo.noaa.gov/operations/../data/messages/2026/06/MSG_20260604_1113.html

Topic: Jason-3 Data Delay

Date/Time Issued: June 04, 2026 1113Z


Product(s) or Data Impacted: Jason-3 Data 


Date/Time of Initial Impact: June 04, 2026 1024Z

Date/Time of Expected End: June 04, 2026 1220Z

Length of Event: 1 hour 56 minutes 

Details/Specifics: During rev 48573 (AOS 1024Z), the port connection to fcig1 dropped. We were unable to reconnect to fcig1 throughout the remainder of the support, even after the FCDA performed a reset. The next support (AOS 1220Z) will use fcig2. We will attempt data recovery during upcoming successful supports.


This notification was sent to ESPC.Notification@noaa.gov mailing list. If you wish to unsubscribe or subscribe to this list, please contact ESPC Help-Desk at ESPCOperations@noaa.gov with your request. Please note: it may take up to two business days to process your request. For any additional information you can reach ESPC at 301-817-3880 (24x7).









ApplySandwichStrip

pFad - (p)hone/(F)rame/(a)nonymizer/(d)eclutterfier!      Saves Data!


--- a PPN by Garber Painting Akron. With Image Size Reduction included!

Fetched URL: http://www.ospo.noaa.gov/operations/../data/messages/2026/06/MSG_20260604_1113.html

Alternative Proxies:

Alternative Proxy

pFad Proxy

pFad v3 Proxy

pFad v4 Proxy